Construction Steps of Biopharmaceutical Cleanroom Engineering

June 4, 2025

Introduction to Construction Steps of Biopharmaceutical Clean Engineering

(1). Preliminary Preparation Phase

1. Project Planning and Design: Complete the layout design, airflow organization, and cleanliness classification of the cleanroom according to GMP requirements and production process needs.

2. Material and Equipment Procurement: Strictly select cleanroom-compliant building materials, HVAC units, HEPA filters, and other key equipment.

3. Construction Team Training: Provide specialized training for construction personnel on cleanroom construction standards and contamination control measures.

أحدث حالة شركة حول Construction Steps of Biopharmaceutical Cleanroom Engineering  0

(2). Main Construction Phase

1. Building Structure Construction: Complete the main structure of the facility, paying special attention to dust-proof and leak-proof treatments.

2. Enclosure Installation: Use clean materials such as color steel plates to construct walls and ceilings, ensuring airtightness.

3. HVAC System Installation: Install and commission ductwork, HEPA filters, FFUs, and other equipment.

أحدث حالة شركة حول Construction Steps of Biopharmaceutical Cleanroom Engineering  1

(3). Clean System Implementation

1. Floor Treatment: Install epoxy self-leveling or PVC flooring suitable for cleanrooms.

2. Electrical System Installation: Ensure lighting, sockets, and automation control systems meet explosion-proof and anti-static requirements.

3. Process Piping Installation: Install and validate purified water, water for injection (WFI), and clean gas piping systems.

أحدث حالة شركة حول Construction Steps of Biopharmaceutical Cleanroom Engineering  2

(4). Testing and Validation Phase

1. Cleanliness Testing: Conduct particle counting and microbial sampling tests.

2. System Validation: Perform DQ/IQ/OQ/PQ validation for HVAC, water systems, and other critical systems.

3. Final Acceptance: Compile complete construction documentation and pass GMP compliance inspections.

أحدث حالة شركة حول Construction Steps of Biopharmaceutical Cleanroom Engineering  3

(5). Post-Construction Maintenance

1. Develop Maintenance SOPs: Establish standard operating procedures for regular filter replacement and environmental monitoring.

2. Ongoing Personnel Training: Ensure operators are familiar with cleanroom behavior protocols.

3. System Optimization: Adjust parameters such as pressure differentials and air changes based on production needs.